THE KALMAN Co.
ListingsKnow NantucketAbout
Contact Sean
Selling · What the buyer's attorney will find · Updated October 13, 2026

Selling a Nantucket house with unpermitted work: what the buyer's attorney will find

By Sean Kalman — The Kalman Co., brokered by eXp Realty. Island houses collect improvements over the decades, and not all of them collected permits. That's rarely fatal to a sale. What hurts is when the buyer's side finds it first, three weeks into a deal. Here is what gets checked, what time does and doesn't fix, and how to decide between correcting it and pricing for it.

Almost every long-held island house has something: a deck that grew, an outdoor shower added one spring, a basement finished by a brother-in-law, a garage loft with a bed in it. Owners tend to either forget these or worry about them more than they need to. The useful position is in between. Know exactly what you have, and decide what to do about it before a buyer is involved.

What the buyer's attorney pulls from the town

During the inspection period, the buyer's attorney or agent reads the property's file. It isn't a deep investigation. It's a comparison between what's on record and what's standing.

  • The Building Department file: permits for the house and every addition, and the certificates of occupancy that closed them out
  • The Historic District Commission file: approvals for exterior work, which on Nantucket means nearly anything visible
  • The Board of Health file: the septic system's design, including the number of bedrooms it was permitted for
  • Zoning records: any special permits or variances, and whether the house fits its lot's limits
  • The plans on record, against the rooms, decks and outbuildings in the listing photographs

When the listing shows five bedrooms and the septic permit says three, or the photographs show a deck the file has never heard of, the questions start.

The problems that come up most on island houses

  • Decks, porches and outdoor showers added without a permit or without historic commission approval
  • Finished basements and attic rooms, often with electrical and plumbing work nobody inspected
  • A garage, shed or studio turned into sleeping space
  • More bedrooms than the septic system allows
  • Exterior changes the commission never saw: windows, doors, roof decks, fences, even colors
  • A permit that was opened and never closed, so the work was approved but never given a final inspection

The last is the most common and the easiest to fix, and owners usually don't know about it until someone looks.

A brick and cobblestone passage between two gray-shingled Nantucket buildings at sunset

Older than the rules is not the same as against the rules

Many island houses sit closer to a lot line, or cover more of their lot, than today's zoning would allow. That alone isn't a violation. A house that predates the rule is lawful, and it can generally be altered as long as the existing problem isn't made worse.

State law also puts a time limit on zoning enforcement. Work done under a building permit can't be challenged on zoning grounds after six years. A structure built without a permit becomes lawful for zoning purposes once it has stood ten years without a recorded enforcement action.

That protection is narrower than it sounds. It covers zoning: where a structure sits and how much ground it covers. It doesn't make unpermitted wiring safe or inspected, it doesn't supply a missing certificate of occupancy, it doesn't satisfy the historic commission, and it doesn't add bedrooms to a septic permit. A buyer's lender and insurer care about all four.

The bedroom count and the septic design

On a house with a septic system, the permitted bedroom count is the house's legal capacity, whatever the floor plan shows. A listing can't honestly call a house five bedrooms on a three-bedroom system, and a buyer who plans to rent will check, because the town ties rental occupancy to the same number.

If your house has more sleeping rooms than its permit, there are only three honest paths: upgrade the system, connect to town sewer if it's available, or list the house at its permitted count and describe the extra rooms as what they are.

How to read your own file first

You can do the buyer's homework before the buyer does. It takes an afternoon and a few requests.

  • Ask the town for what it has on the property: the Building Department for permits and certificates of occupancy, the Historic District Commission's office for its approvals, and the Health Department for the septic permit and plan.
  • Make a list of everything you've added or changed since you bought the house, and as much as you know about what earlier owners did.
  • Walk the property with the file in hand. Every deck, shower, shed, dormer and finished room should match a permit. Note the ones that don't.
  • Count bedrooms the way a buyer will: any room someone sleeps in, whatever you call it, against the number on the septic permit.
  • Check for open permits. Work that was approved but never got its final inspection shows in the file as unfinished business.

What you end up with is a short list, usually shorter than you feared, sorted into things to fix, things to explain, and things that were fine all along.

Fix it first, or price for it

Fix it first when the fix is simple. An open permit that needs a final inspection, a deck that needs a permit it would easily get, a fence or a window the commission would approve: these cost little next to what they cost in a negotiation. A problem found by the buyer is priced at the buyer's estimate, which is usually higher than the real one.

Disclose it and price for it when the fix is large or uncertain. An addition that would need zoning relief, a septic upgrade on a tight lot, a structure the commission might not approve as built. Here the better course is usually to get a clear written picture of what it would take, put it in front of buyers at the start, and let the price reflect it. Buyers can work with a known problem. They walk away from surprises.

What you're required to tell a buyer is a question for your attorney, and it's worth asking before you list, not after an offer. What's practical is simpler: assume the file will be read, and don't describe the house in a way the file contradicts.

Legalizing work after the fact

Towns, including this one, can permit work that's already been done. It usually means drawings of what was built, an application, and inspections, and for anything covered up, an inspector may ask to see inside a wall or a ceiling. Exterior work also goes to the historic commission, which reviews it as if it were new, and the commission can require changes to what's there.

None of it is quick. If you think you'll sell in the spring, the time to start is the fall before, and the Building Department and the commission's staff are the people to ask about what your particular case will involve.

Questions owners ask about unpermitted work

Can I sell a Nantucket house with unpermitted work?

Yes. Houses sell with open permits and unpermitted improvements regularly. What matters is knowing what you have before a buyer finds it, and either correcting it or presenting it openly and pricing for it.

How does a buyer find out about unpermitted work?

The buyer's attorney or agent compares the town's records, including building permits, certificates of occupancy, historic commission approvals and the septic permit, with what's standing on the property and shown in the listing.

Does unpermitted work become legal after enough time?

For zoning only. Under state law, a structure built without a permit is treated as lawful for zoning purposes after ten years without a recorded enforcement action, and permitted work after six. That doesn't supply a building permit or a certificate of occupancy, satisfy the historic commission, or change a septic permit.

How do I get a permit for work that's already done?

Usually with drawings of what was built, an application to the Building Department, and inspections, which can mean opening finished surfaces. Exterior work also needs the Historic District Commission's approval. Start well before you plan to list.

Can a bedroom count that doesn't match the septic permit stop a sale?

It can stall one. The permitted bedroom count is the house's legal capacity. The honest paths are upgrading the system, connecting to sewer where it's available, or listing the house at its permitted count.

Will unpermitted work affect the buyer's mortgage or insurance?

It can. Lenders and insurers may ask about certificates of occupancy and about work that was never inspected, which is one reason problems found late tend to end deals.
Sources: M.G.L. c.40A §7 (the six- and ten-year limits on zoning enforcement) · Nantucket Zoning Bylaw, Chapter 139, §139-33 (preexisting nonconforming structures), as covered in the zoning guide · the HDC guide for exterior review · the Title 5 guide for permitted bedroom counts · the short-term rental guide for occupancy. This page isn't legal advice.
Keep exploring Nantucket real estate.
The Seller's ChecklistThe Zoning GuideWorth More as Land?What Is My Home Worth?

Before you list, read your own file

I pull the town's file for every house I list, the way the buyer's attorney will, and walk the property with it in hand. Most of what turns up is small, and all of it is easier to handle with no deadline attached. Call or text me and we'll start there.
Call or text 508-228-4578 Email Sean
Explore
HomeListingsOpen HousesNeighborhood Guides
Insights
Know NantucketTalking NantucketMarket Report
Guides
Buying GuideSelling GuideHome ValuationAll Island Guides
Company
About & TeamContact
THE KALMAN Co.
InstagramFacebookLinkedIn
Nantucket, MA 02554 · 508-228-4578 · sean@thekalmanco.com · Brokered by eXp Realty